Skip to main content
Image

4 results for “case study, energy”

Case Study

Image
GGB's Bearings for China's Xiangjiaba Hydropower Plant

Special Hydro Bearings for China’s Xiangjiaba Hydropower Plant

GGB recently delivered its specially designed, fiber reinforced composite bearings for assembly of the first wicket gate for the first of four Francis turbines that will drive China’s Xiangjiaba hydropower plant.

Case Study

Image
GGB DB Bearings for Panama Canal

Innovative hydro bearings help keep Panama Canal cleaner

GGB recently developed a new type of pintle bearing for refurbishment of the miter gates in the Panama Canal’s lock system.

Case Study

Image
ggb bearings for locker system in panama canal

GGB Continues to Expand Its Role with the Panama Canal

Annual traffic through the Panama Canal has grown from 1,000 ships when the canal first opened, to nearly 15,000 ships in 2014.

Case Study

Image
GGB self-lubricating HPM hydro bearings and HPF hydropower bearings specified for the belo monte project

Belo Monte Hydropower

Brazil’s Belo Monte Hydroelectric Dam is a complex of dams, numerous dykes and a series of canals supplying two different power stations with water.

Need advice?

Our experts are ready to help you find the right solution for your specific application.